大学英语六级阅读理解真题_2017年6月大学英语六级阅读理解每日一练(67)

副标题:2017年6月大学英语六级阅读理解每日一练(67)

时间:2024-01-01 02:01:01 阅读: 最新文章 文档下载
说明:文章内容仅供预览,部分内容可能不全。下载后的文档,内容与下面显示的完全一致。下载之前请确认下面内容是否您想要的,是否完整无缺。

距离2017年6月大学英语六级考试还有一个半月的时间,已经报名的同学备考一定要抓紧,不要临时抱佛脚。新东方在线英语六级频道为大家整理了英语六级阅读理解每日一练,每天一道题考试不担心。
2017年6月大学英语六级阅读理解每日一练.jpg
2017年6月大学英语六级阅读理解每日一练
  In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular (标准件的) system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.
  There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.
  After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.
  After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.
  In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.
  1. The main difference between panel method and the method discussed in the last paragraph is_______.
  A. the latter uses ready-made internal features
  B. panels are cast in a level position
  C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms
  D. the former is more expensive than the latter
  2. Which of these statements is TRUE of system building?
  A. It employs more men. B. It is difficult and dangerous.
  C. It can save both time and money. D. It means less mechanization.
  3. According to the passage, the principle of system building is that_______.
  A. construction methods are safer
  B. buildings are made from a set of standardized units
  C. similar buildings can be produced
  D. all units are produced on the site
  4. The usual fixed length in the modular system is_______.
  A. twenty centimeters B. ten millimeters
  C. fifty centimeters D. ten centimeters
  5. What lifts the concrete panels onto the building?
  A. Cranes. B. Man-power.
  C. Pulleys. D. Hydraulic jacks.
  参考答案: 1. A 2. C 3. B 4. D 5. A

2017年6月大学英语六级阅读理解每日一练(67).doc

本文来源:https://www.wddqw.com/xx2I.html