常用的建筑工程英语口语句子

时间:2023-02-15 03:05:01 阅读: 最新文章 文档下载
说明:文章内容仅供预览,部分内容可能不全。下载后的文档,内容与下面显示的完全一致。下载之前请确认下面内容是否您想要的,是否完整无缺。

【#英语口语# 导语】工程英语收录了工程专业词汇、标准句型以及一些常用的机械工程,可以帮助英语爱好者全方位积累工程英语词汇。以下是©文档大全网整理的常用的建筑工程英语口语句子,欢迎阅读!


   


1.常用的建筑工程英语口语句子 篇一


  The design of the process piping is performed directly on a model of the project.


  The model is an actual working tool for piping.


  Piping erection work include: prefabrication, placing, aligning, welding and bolting.


  Our piping prefabrication workshop covers a total area of 1000m2.


  We can perform the pipe by following operations: cutting and mechanical chamfering, manual and automatic welding.


  The computer generates isometric drawings and prints out bill of materials.


  We shall complete the manhour requirements for the site fabrication (site erection ) of this drawing.


  Seamless steel tube is made in sizes for 1/8 to 24 inches.


  Spiral-welded steel pipe is available in sizes from 6 to 36 inches.


  Two types of end are standard on steel pipes and fittings, that is flanged and screwed.


  This pipe is made of carbon steel (stainless steel ,cast iron, plastic).


  We usually use elbow (bend, flange, tee, reducer) as a kind of pipe fitting.


2.常用的建筑工程英语口语句子 篇二


  We use Scientific-management system for material shortage and its control.


  These materials are imported from abroad(supplied by the Seller).


  What is the feature about it?


  The construction material answers our purpose satisfactorily.


  The average traffic fuel (gasoline) consumption of this lorry is 0.3 liter per kilometer (l/km).


  Hydraulic oil (lubrication oil )which having a viscosity of about 4.5°Eat 50 ℃ can be used for this vehicle (machine).


  This special oil comes from the “SHELL” company.


  Cement steel and timber are the most important construction materials used in civil engineering.


  Typical structural steel shapes include beams, channels, angles and tees.


  There are four broad classifications of steel : carbon steels, alloy steels, high-strength low-alloy steels and stainless steels.


3.常用的建筑工程英语口语句子 篇三


  Copper, zinc, lead, aluminium, bronze and brass are nonferrous metals or alloys.


  This alloy is mainly composed of element chromium and nickel (titanium, vanadium, manganese).


  The standards “GB” and “YB” provide the method of testing for materials in our country just like the standard ASTM in America.


  We have asbestos (rubber, plastic, glass, paint) products of all kinds.


  Bolt (screw, nut, stud, spring washer, pin, ball bearing, roller bearing) is the most commonly used machine part.


  Cast iron cannot compare with steel in tensile strength.


  Erection of the equipment will be carried out according to the specifications and drawings.


  All site erection works will be performed by the Buyer under the technical instruction of the Seller.


  The construction company is fully in charge of the administration of all erection work.


4.常用的建筑工程英语口语句子 篇四


  Our company cover all construction activities, that is : piling , civil engineering, mechanical erection, piping, electrical, instrumentation, painting and insulation work.


  What is the feature of this cracker (cracking furnace, heating furnace, reactor, mixer, centrifuger, belt-conveyer) ?


  The spherical tank (gas holder , container) will be shipped in the condition of edge prepared and bent plates.


  I think that the on-site training will be necessary for the tank.


  The cooler (condenser, separator, boiler, generator, scrubber, stripper, heat exchanger )is a pressure vessel. It is subject to the pressure vessel code.


  The pressure vessel must be inspected by our authoritative organization-Administration of Labour.


  The new reciprocating (centrifugal, opposed-balanced) compressor will be installed next week.


5.常用的建筑工程英语口语句子 篇五


  The distilling column( absorber, column evaporator, regenerator, column washer) is a kind of equipment for outdoor installation.


  The TG70 steam turbine has a operation speed of 9600 rotations per minute( RPM).


  What do you think of this erection work?


  This low (middle, high ) pressure blower (pump) will be assembled in the No.3 workshop.


  We are adjusting (installing, checking, aligning , leveling, purging )the equipment.


  The working team will finish the job next week.


  We can adjust the levelness of the machine by means of shim and screw jack.


  After seven days , the grouted mortar will have concreted, then we shall tighten the anchor bolts.


本文来源:https://www.wddqw.com/D27m.html