1.工程英语口语句子 篇一
It is very fine today, the weather is suitable for our work.
今天天气很好,适合我们工作。
It is not at all a nice day. It will get hot.
天气一点也不好,要变热起来。
We can not continue the outdoor work, because it is raining now.
因为现在下雨,我们不能继续在室外工作。
It is going to storm tomorrow, some measures must be taken to prevent wind.
明天将起风暴,必须采取一些措施防风。
The lifting work on site will be compelled to stop, owing to the strong wind.
由于强风(浓雾),现场起重吊装工作将被迫停止。
We have a nap(interval)after lunch in hot season.
热天午餐后,我们有一个午睡(中休)时间。
2.工程英语口语句子 篇二
It is an inquiry (commercial and technical proposal, approval, agreement ,protocol, annex, technical appendix) about this project.
There are many information in the technical proposal, which including: process flow, process decription, capacity of the plant, performance of the product.
There are two units (installations) in the contract plant.
The project team normally consists of project engineer, design engineer ,schedule engineer, and various specialists.
We can evaluate the results of field construction by four criteria, which are quality ,time, cost and safety.
I am responsible for the technical (scheduling, inspection, quality control) work of this project.( area)
Would you tell us the technical characteristic about this project?
3.工程英语口语句子 篇三
Our company cover all construction activities, that is : piling , civil engineering, mechanical erection, piping, electrical, instrumentation, painting and insulation work.
What is the feature of this cracker (cracking furnace, heating furnace, reactor, mixer, centrifuger, belt-conveyer) ?
The spherical tank (gas holder , container) will be shipped in the condition of edge prepared and bent plates.
I think that the on-site training will be necessary for the tank.
The cooler (condenser, separator, boiler, generator, scrubber, stripper, heat exchanger )is a pressure vessel. It is subject to the pressure vessel code.
4.工程英语口语句子 篇四
Total Quality Control(TQC) is a better quality control system.
全面质量管理(简称TQC)是一种较好的质量管理体系。
TQC over the project will be strengthened.
对于这个工程的全面质量管理将要加强。
To maintain the best quality of the construction work is the important responsibility of the field controllers.
保持施工工作的优良质量是现场管理人员的重要职责。
We possess skilled technician and complete measuring and test instruments used to ensure the quality of engineering .
我们拥有熟练的技术力量和齐全的检测手段,可以确保工程质量。
Field inspection work is handled (executed, directed )by our Inspection Section.
现场检查工作由我们的检查科管理(实施、指导)。
Our site quality inspector will report to the Project Manager everyday.
我们的现场质量检查员将每天向工程项目经理汇报。
5.工程英语口语句子 篇五
1、Pay attention to safety!
注意安全。
2、Put on your safety helmet (safety harness, safety footwear, safety goggle, ear defender), please.
请戴上安全帽(安全带,安全靴,护目镜,护耳器)!
3、Danger!
危险!
4、Look out! Be careful!
当心!
5、Get out of the way.
快躲开!
6、No admittance!
禁止入内!
7、Smoking and lighting fires are strictly forbidden at here.
这里严禁烟火。
8、Look at the sign, danger keep out.
注意标牌,危险勿进。
9、I am sorry, do not touch this, please.
很抱歉、请勿触动!
10、Check and maintain your electrical appliance regularly.
定期检查和保养你的电动用具。
11、Wear a safety harness properly attached to an appropriate anchorage.
佩戴的安全带需系于稳固点上。
正在阅读:
工程英语口语句子01-12
2018年福建福州市农业局拟录用公务员公示【8月22日截止】07-10
2018年中考成绩查询网址_内蒙古呼和浩特2018中考成绩查询网址:http://www.hhkszx.cn/05-06
公务员上班迟到检讨书3000字以上:公务员上班迟到检讨书模板03-31
广东茂名2019中考成绩查询网址:http://www.mmjy.gov.cn/11-25
2023年贵州HSK汉语水平考试成绩查询时间及入口【网络考后2周纸笔考后1月】02-03
2021年9月安徽医科大学全国计算机等级考试报名通知07-31
2017年2月医生入党志愿书范文09-13
微笑的味道作文800字10-10