When construction begins on the Messina Strait Bridge in 2005, the first job will be to erect two 370 meter-tall steel towers. (3) Getting these cables up will be something. It's not just their length — totally 5.3 kilometers — but their weight. (4)
After lowering vertical"suspender"cables from the main cables, builders will erect a 60 meter-wide 54.630-ton steel roadway, or
deck—wide enough to accommodate 12 lanes of traffic. The deck's weight will pull down on the cables with a force of 70,500 tons. In return, the cables yank up against their firmly rooted anchors with a force of 139,000 tons — equivalent to the weight of about 100,000 cars. Those anchors are essential. (5)
A Some environmentalists are against the project on biological grounds.
B What do the world's longest bridges have in common?
C If true, one day you might spy the beast while zipping (呼啸而过) across the Messina Strait Bridge.
D They're what will keep the bridge from going anywhere.
E The second job will be to pull two sets of steel cables across the strait, each set being a bundle of 44,352 individual steel wires.
F They will tip up the scales at 166,500 tons — more than half the bridge's total mass.
答案:C B E F D
1. C 选项 C:关键词 beast,与第一句的 monster相呼应。所以, C是正确答案。
2. B 第二段第二句的主语是 They。
由于表语是 suspension bridges,They替代的一定是前面句子出现过的 bridges。六个选项中,只有 B含有 bridges。填在第三段段首,意思连贯。
3. E“空 3”前面的句子有 the first job这几个词。有 first,必有 second/then。六个选项中只有 E 含有 The second job。所以,E是答案。
4. F “空 4”前面的句子说的是,把这些吊索吊高定位是有难度的,不仅仅由于它们很长,还由于它们很重。 F 具体地介绍了它们的重量,应该是“空 4”前面的句子的后续句。
5. D “空 5”前面的句子说的是,桥桩很重要。为什么很重要呢?
D解释了桥桩的作用,意义连贯,所以是答案。
2017职称英语等级试综合类B级综合练习六.doc正在阅读:
2019年河南驻马店成人高考报名入口开通03-05
2018江西赣州市老年大学招募高校毕业生见习公告【4人】05-25
有关暑假的英语手抄报07-14
2021年音乐教师个人教学工作计划|2021年音乐教师个人教学工作总结07-31
2021年江苏专升本成绩查询网站入口:江苏省教育考试院08-11
2018年北京一级造价工程师资格审核时间:8月29日-31日07-15
精选大学生英语日记带翻译:机遇08-11