【#英语口语# 导语】工程是通过科学和数学应用,使自然界的物质和能源特性能够通过各种结构、机器、产品体现出来。以下是©文档大全网整理的建筑工程的英语口语,欢迎阅读!
1.建筑工程的英语口语
The transfer medium in this pipeline is liquid ammonia (process air , soft water, alkali liquor, acidic gas).
这条管线的输送介质为液氨(工艺空气、软水、碱液、酸性气体)。
This is a gate valve (check valve, butterfly valve, cut-off valve, magnetic valve, remote valve, relief valve, throttle valve, cock).
这是一个闸阀(止回阀、蝶阀、切断阀、电磁阀、遥控阀、安全阀、节流阀、旋塞)。
Please explain the method of field test and flushing (blowing off )of the pipelines.
请说明管线的现场试验和冲洗(吹净)方法。
We shall conduct the clean water for the hydrostatic test of the austenitic stainless steel pipe.
我们将为奥氏体不锈钢管的水压试验引进净水。
We need a piping material list (list of piping support, bill of welding rod ).
我们需要一份配管材料表(管架一览表、焊条明细表)。
The welding (heat treatment )of pipes have been carried out with incorporated programming.
管子的焊接(热处理)现已按照编写的程序完成。
We can carry out various treatment for the inner surface of pipes, such as sanding , chemical pickling, purging and passivation.
我们可以进行管子内壁的各种处理,诸如:喷砂、化学酸洗、冲洗和钝化。
2.建筑工程的英语口语
Total Quality Control(TQC) is a better quality control system.
全面质量管理(简称TQC)是一种较好的质量管理体系。
TQC over the project will be strengthened.
对于这个工程的全面质量管理将要加强。
To maintain the best quality of the construction work is the important responsibility of the field controllers.
保持施工工作的优良质量是现场管理人员的重要职责。
We possess skilled technician and complete measuring and test instruments used to ensure the quality of engineering .
我们拥有熟练的技术力量和齐全的检测手段,可以确保工程质量。
Field inspection work is handled (executed, directed )by our Inspection Section.
现场检查工作由我们的检查科管理(实施、指导)。
Our site quality inspector will report to the Project Manager everyday.
我们的现场质量检查员将每天向工程项目经理汇报。
3.建筑工程的英语口语
We shall put the machine to trial (test run) after the erection work has been finished.
这台机器安装工作完成以后就将进行试车。
The mechanical completion check list of the unit has been approved by both of the Buyer’s and Seler’s representative.
这个装置的机械竣工检验表已由买方和卖方的代表审定。
We should start the installation according to the instruction and operation manual.
我们应该根据说明书和操作手册来开动这个装置。
The systematic hydrostatic test (dry run , hot test, dynamic test, actual start-up ) is scheduled for next Monday.
系统水压试验(学习、加热试验、动力试验、实际开车)定于下星期一进行。
We have planned to finish the adjustment of the machine before Tuesday.
我们计划在星期二以前完成机器的调试工作。
Before initial start-up of the installation, we must check the equipment carefully.
在装置初次开动以前,我们必须仔细地检查这些设备。
4.建筑工程的英语口语
The alignment of the coupling should be performed by two dial gauges.
靠背轮的找正对准应用两只千分表来进行。
The maximum allowable misalignment of the coupling is 0.02mm.
靠背轮找正的允许偏差为0.02毫米。
How many radial (axial ) clearnance are there in this bush (journal bearing , thrust bearing) ?
这个轴套(轴颈轴承、止推轴承)的径向(轴向)间隙是多少?
Does the bolt fit the nut?
螺栓与螺母不配。
We prefer welding to riveting.
我们认为焊接比铆接好。
Do you know how to assemble (adjust )this new machine?
你知道如何装配(调整)这台新机器吗?
There are many tools in my tool storage unit (tool chest, tool box).
我的工具柜(工具盒、工具箱)里面有很多工具。
5.建筑工程的英语口语
Get me a hammer (hacksaw, file, scraper, chisel, socket, wrench, hook spanner, adjustable wrench, pipe wrench, ratchet wrench, open end wrench, screw driver, hand vice, pliers, pocket knife).
给我拿一把手锤(钢锯、锉刀、刮刀、凿子、套筒扳手、钩扳手、活动扳手、管扳手、棘轮扳手、开口扳手、螺丝刀、手钳、扁嘴钳、小刀)。
Straightedge rule (square rule, slide gauge, inside and outside micrometer, steel tape, feeler, dial gauge, depth micrometer, wire gage, radius gage, thread pitch gage) is a kind of common measuring tool.
直尺(角尺、游标卡尺、内径和外径千分尺、钢卷尺、塞尺、千分表、深度千分尺、线规、半径规、螺距规)是一种常用量具。
The precision of this fitter level (cross-test level) is 0.02mm/M.
这个钳工水平仪(框架式水平仪)的精度为0.02毫米/米。
We have got the instrument (pressure gauge, thermometer, tachometer, current meter, universal meter) ready for the experiment (test).
我们已经准备好做实验(试验)的仪器(压力表、温度计、转速计、电流表、万用表)。
That is an air (electric) powered grinder (portable grinder, angle grinder, straight grinder, drill, impact wrench, riveting hammer, hammer drill).
那是一个气(电)动砂轮机(手持砂轮机、角型砂轮、直型砂轮、钻机、冲击扳手、铆钉锤、锤钻机)。
Our electrical tools are double insulated and approved to international safety standards.
我们的电动工具都是双重绝缘的,并符合国际安全标准。
正在阅读:
建筑工程的英语口语摘抄08-24
2020年山东淄博医师资格考试报名审核材料上传时间延长通知12-22
留在记忆里的粽香作文700字08-15
2019年河南中考历史试卷及答案解析-2019年河北沧州中考历史答案11-06
2020年贵州执业医师实践技能考试成绩查询及合格分数线公布12-02
中考优秀作文范文:失败也是一首歌10-08
幼儿园小班地球日主题活动方案【整合版】10-25
语文版七年级上册二单元作文:因为有你04-06