pmp报名项目经验描述模板

时间:2023-02-08 21:08:27 阅读: 最新文章 文档下载
说明:文章内容仅供预览,部分内容可能不全。下载后的文档,内容与下面显示的完全一致。下载之前请确认下面内容是否您想要的,是否完整无缺。


PMP ()

(2)

--本页仅作为文档封面,使用时请直接删除即可-- --内页可以根据需求调整合适字体及大小--


.

To realize the equipment life cycle management, optimize the equipment utilization.

IN: Develop project scopes and objectives; write the bidding document. PL: Open tender; design the system architecture; make project plan.

EX: Demand investigation; system detailed design; time control; check whether the system functions to meet the needs of users. MC: Feedback problem; risk management.

CL: Check the archiving documents; complete the online test run and final acceptance.

Project activities Project completed on schedule. Meet user needs. .

Project objective: Implement a new website to trace the vendors’ working hours and generate the monthly report.

IN: Define the project scope; Identify risks; obtain approval from stakeholders.

PL: Prepare the project plan and develop the work breakdown structure.

EX: Manage physical move; Manage communication.

MC: Hold daily stand-up meeting; Manage changes to scope, schedule.

CL: Final acceptance from customer; Deliver trainings; Archive the documents.

Production issues are fixed in time. Functions added. No budget exceed. 三.

The goal of the project is to provide solutions for solar thermal power control system.

IN: Identify stakeholders of the project and analyze the different needs of stakeholders.

PL: Determine the team members, establish a incentive mechanism, identify and evaluate risks.

EX: Ensure project delivered on time. Manage changes, measure performance.

2


本文来源:https://www.wddqw.com/doc/f1a9caaaa3116c175f0e7cd184254b35eefd1acb.html